Project | Description | Funding Source | Funding Category | Year Funded | Council District | Municipality |
---|---|---|---|---|---|---|
21st Avenue Sidewalk Widening and Extension | Reconstruction and widening of existing sidewalk on the land side of Palm Blvd. between 21st and 41st Avenue and extend sidewalk along 21st Avenue to Intersection at Waterway Blvd. | CTC | CTC | 2023 | 2 | City of Isle of Palms |
Central Park Road Culvert Replacement | Installation of a box culvert to address drainage issues at James Island Creek. | CTC | CTC | 2021 | 8 | City of Charleston |
Collins Signal (at MRF - Materials Recovery Facility) | Intersection signal installation at Collins Road and MURF. | TST | Economic Development | 5 | City of North Charleston | |
Cosgrove Avenue and Azalea Drive Pedestrian Improvement | Signal design and construction for pedestrian upgrades. | TST Allocation | Bike/Pedestrian | 2022 | 4, 5 | City of North Charleston |
Courtenay Drive and Doughty Street Signal Upgrade | Installing pedestrian signals and crosswalks to improve safety. | TST Allocation | Intersection | 2021 | 3 | City of Charleston |
Derries Road | Paving of a dirt road. | TST Allocation | Rural Roads | 2021 | 2 | Unincorporated Charleston County |
East Ashley Avenue Drainage Phase II | CTC | CTC | 9 | City of Folly Beach | ||
East Bay Street Sidewalk | Installation of sidewalk from Charlotte Street to existing sidewalk on 515 East Bay St. with ped ramp at northwest corner of Charlotte and East Bay with a crosswalk crossing Charlotte St. (Preliminary Plan phase.) | TST | Bike/Pedestrian | 2022 | 3 | City of Charleston |
International Boulevard at Tanger Outlet Boulevard | Installing right turn lane on International Boulevard to Tanger Outlet Boulevard. | CTC | N/A | 2020 | 5 | City of North Charleston |
Long Point Road Improvements | Concept design (Phase 1) to raise existing roadway elevation of Long Point Road, from Needle Rush Parkway to Oak Avenue, in order to alleviate frequent flooding from rainfall events during high tide and flooding from king tides. | CTC | CTC | 2023 | 1 | Town of Mount Pleasant |
Main Road Corridor: Segment A | Segment A: US 17 and Main Road Intersection & Main Road Improvements – Bees Ferry to River Road | TST | Featured Project | 6, 8 | Regional Improvement | |
Maybank Highway and Woodland Shores Road Complete Streets Project | Installation of pedestrian crossing on Maybank Highway at Pour House/The Terrace Plaza and a sidewalk along Maybank Highway/Woodland Shores Road. | CTC | 2020 | 9 | City of Charleston | |
McBride Road | Paving of a dirt road. | TST | 2021 TST Rural Roads | 2021 | 2 | Unincorporated Charleston County |
Northside Drive Sidewalk | Installation of sidewalk on Northside Drive from Norwalk Drive to Ashley Phosphate. | CTC | CTC | 2018 | 5 | City of North Charleston |
Otranto Road and Deerwood Drive Intersection | Aligning the north leg of Deerwood Drive with the south leg at the intersection of Otranto Road. | TST | Intersection | 2021 | 4 , 5 | City of North Charleston |
Palmetto Commerce Interchange | Construction of a new interchange connecting I-26 to Weber Boulevard between US 78 and Ashley Phosphate Road. | AAII Special Source Bonds | Featured Project | 2016 | 5 | City of North Charleston |
Phillips Community Drainage Project | Enlarging pipes and drainage canal running through the Phillips Community. | TST | Drainage | 2012 | 1 | Town of Mount Pleasant |
Pickney & Mercantile Drainage Improvements | Improve drainage at the intersection of Pickney & Mercantile | CTC | CTC | 2023 | 2 | Town of McClellanville |
Pickney Street Traffic Calming | Installation of a traffic speed hump on Pinckney near Mercantile. | CTC | CTC | 2024 | 2 | Town of McClellanville |
Raccoon Island Road | Rocking Raccoon Island Rd | TST | Rural Roads | 2020 | 8 | Unincorporated Charleston County |
Resurfacing TST FY2024 Rejuvenator | This pavement preservation project includes the application of an asphalt rejuvenating agent on all roads 2-3 years after resurfacing and again 5 years later (or 8 years since resurfacing). | TST | ||||
Resurfacing FY2024 Parking Lots Resurfacing Plan | Resurfacing of two County maintained parking lots - PSB, North Charleston and the Judicial Center Courthouse, Downtown | 3,5 | ||||
Resurfacing TST FY2023 Rejuvenator | This pavement preservation project includes the application of an asphalt rejuvenating agent on all roads 2-3 years after resurfacing and again 5 years later (or 8 years since resurfacing). | TST | ||||
Resurfacing CTC FY2023 Resurfacing Plan A | This work shall include traffic control, milling, surface preparation, asphalt resurfacing, striping, concrete driveways, and associated appurtenances of various local paved roadways within the boundaries of Charleston County. This project will include River Road (Main to Maybank) Approx 5 miles. Project expected to advertise for construction June 2023. | CTC | ||||
Resurfacing CTC FY2023 Resurfacing Plan B | This work shall include traffic control, milling, surface preparation, asphalt resurfacing, striping, concrete driveways, and associated appurtenances of various local paved roadways within the boundaries of Charleston County. Roads TBD. | CTC | Special Allocation | 2023 | 2,5,6,7,8,9 | Unincorporated Charleston County |
SCDOT Crosswalk Enhancements, Phase 2 (700 Crosswalks Phase II) | 700 Crosswalks Phase II (Remount and I-26 EB ramps (S-13 and I-26), Leeds Avenue and Azalea Drive (S-475 and S-894), St. Andrews Blvd and Riverdale (SC 61 & S-193), East Bay Street and Columbus Street(US-52 and S-887), Fielding Connector and Croghan Spur (SC-61 and local road) , Azalea Drive and Industrial Ave (S-894 & S-895) | TST | Bike/Pedestrian | 2016 | 3, 4, 5, 6, 7 | North Charleston, City of Charleston, Unincorporated Charleston County |
Shadow Lane Right Turn Lane | Add a turn lane onto Shadow Lane at the intersection of HWY 78. | TST | Intersection | 2019 | 5 | City of North Charleston |
Snowden Community Sidewalk | Installation of 1,060 feet of new sidewalk from the intersection of Egypt Rd and Alston Street, along Alston Street, and terminating at the intersection of Maggie Road and Snowden Road. | TST | Bike/Pedestrian | 2022 | 1 | Town of Mount Pleasant |
Winchester St., Lady St., and Pinehurst St. Traffic Calming (Northwoods) | Design and installation of six traffic humps (two per street) in the Northwoods Neighborhood. | CTC | 2024 | CTC |